Principle of pile foundationsPVE 50PR with 7NL promo

A pile foundation is necessary when the loads of a building will be higher than the upper soil layer can take. Piles are installed primarily to avoid settlements which could result in big damages and dangerous situations. In a limited number of projects piles are installed as ‘tension’ piles these are installed to prevent the object from lifting out of the ground. A well-known example are piles installed under the high tension electricity piles. Due to high forces created by wind the piles need to be ’anchored’ in the ground.

Read more

Drilling methods supported by Woltman

The purpose build rigs of Woltman are able to operate in many drilling configurations, such as:
- Semi Displacement drilling
- CFA drilling
- Full displacement drilling
- Double rotary drilling

Read more